New Landowner Checklist

You closed on the land. Here's what actually has to happen before you break ground.

A practical order of operations for raw rural land in Denton County and surrounding areas — what to line up first, what depends on what, and where people typically get stuck.

1. Site evaluation, before anything else

Before you can get a firm quote on a septic system or know exactly where a well should go, you generally want a site/soil evaluation. This tells you what your land's soil can actually support — critical in Denton County, where Blackland Prairie clay in the east behaves very differently than Cross Timbers sandy loam in the west. Skipping this step is the most common reason budgets go sideways mid-build.

2. Water and wastewater — usually in parallel

If you're outside city limits, you'll need a private well for water and a septic system for wastewater. These are usually scheduled around the same time since both depend on the site evaluation, and both typically need to be squared away before most construction lenders will fund the build.

3. Driveway access — before heavy equipment needs it

If your driveway crosses a ditch or drainage path, a culvert needs to go in early — ideally before delivery trucks and equipment start using that access point regularly. An undersized or missing culvert under repeated heavy traffic is a fast way to wash out a driveway before the house is even framed.

4. On-site storage — earlier than most people plan for

A site-built storage building is easy to push to "later," but most landowners find they actually want it early — secure, on-site storage for tools and materials during the build, which then converts into permanent workshop or equipment space once the house is done.

5. Permits — running the whole time in the background

Septic and well work both typically require permits (OSSF through Denton County Public Health for septic; a Groundwater Conservation District permit for wells, if applicable). Culverts crossing county right-of-way may need a permit too. None of these are fast to get if you wait until you need them — starting the paperwork as soon as you have a site evaluation avoids the most common schedule slip.

The short version: site evaluation first, water and wastewater in parallel, driveway access before heavy equipment traffic, storage earlier than you'd think, and permits started the moment you know what you need.